Post Three – Cheshire Project 2022

Once the initial groundwork had commenced the next step was to begin to shore up the the old drainage system and to provide access to the back of the house

Tempoary supports for the old drainage
The old drainage system with temporary support
Temporary access to the back of the house

Leave a comment